土方填筑施工方案(完整版)

土方填筑施工方案(完整版)

2023年7月17日发(作者:)

土方填筑施工方案(完整版)

XXX for the first phase of the Dagupai Drainage Canal

Treatment Project (n 1)。The contract number for this project is

DGPSHZLYQSG/ project team for the first phase

of the Dagupai Drainage Canal Treatment Project (n 1) of Tianjin

Water Conservancy Project Co。Ltd。has prepared this XXX.

of n

XXX:

XXX" SL237-1999;

n XXX" SL260-98;

Standard for XXX Building Engineering Quality" GBJ30;

XXX" GB-2002;

Code for Design of Building n Engineering" GB-2002;

XXX" DL/T5109-1999;

XXX" SL223-2008;

n XXX" SL52-9; Code for n and Acceptance of Water Supply and Drainage

Pipeline Engineering" GB-2008;

XXX" GB -1998;

XXX" SL/T 225-1998;

n bidding documents and bidding drawings for the first phase

of the Dagupai Drainage Canal Treatment Project (n 1)".

ew of the Project and Main Work Content

XXX part of Tianjin。It was excavated in 1958 and was once

one of the two major sewage canals in Tianjin。playing a crucial

role in the city's drainage system。The canal starts at the San

Kong Lock near the Outer Ring Road No。8 Bridge and flows into

the sea after the Donggu Pumping n。with a total length of about

68.8 km。There are two other XXX: the Jizhuangzi River。which

is 3.8 km long and joins the XXX Bridge。and the Xianfeng

Drainage Canal。which is 13.6 km long and joins the XXX four

districts: Nankai。Xiqing。XXX。XXX.

In recent years。with the n of n。the n of hard surfaces has

rapidly increased。and the drainage flow has XXX。XXX

insufficient drainage capacity of the canal。The current Donggu

XXX flooded areas。causing us XXX' lives and n during the high-water season。Due to the influence of the tide level at the estuary。XXX into the sea when the tide is high。and can only use the

XXX.

本工程是为了新建东沽泵站,将现有的2#泵站拆除并在该址上新建泵站,同时保留现有的1#泵站和自流闸。新建的泵站设计流量为41m3/s,装机共设7台1400ZLB-3.5立式轴流泵,配置6kV异步电动机,单机功率300kW,水泵机组装机容量为2.1MW。主要工程项目包括建筑物周围的土方回填和压实、上下游连接段的护堤填筑、泵站厂区的土方回填和压实以及副厂房段基础回填。

填筑土料采用基坑开挖土料进行回填,主要部位包括上游圆弧翼墙、进水池、泵房、副厂房、出水闸及消力池扶壁翼墙以及房建部分基础等。本工程土方回填共需回填土方约1.4万m3,土方开挖总量约为2.4万m3,开挖土方能满足回填土方的需要,土方填筑采用基槽开挖土方。 施工程序和施工方法中,XXX填筑的施工准备包括现场碾压试验和土料击实试验。施工程序包括人工分层碾压、机械分层碾压、分层铺土回填、基面处理、与新建建筑物相接处理和与原开挖边坡相接处理。

During the process of backfilling。strict XXX。thickness of

spreading。XXX the method of forward and backward staggered

rolling。and the overlap width of the rolling tracks should be

greater than 10cm。Manual n should reach the requirements for

each layer of 20m before pushing forward。The overlap of the

manual n and the rolling should not be less than 0.5m。XXX

should overlap by 0.5m。and the distance een the upper and lower

layers should not be less than 1m。Before rainfall。the surface of

the working area should be compacted and loosened。and the

working area should be made into an arch or XXX。the mud on

the surface of the XXX backfilling process。XXX。XXX.

5.2 Other Material Backfilling

5.2.1 XXX According to the bidding requirements of the project。XXX

backfilling the lower part of the sub-factory n。P.O 42.5 cement is

used for backfilling。and the XXX over is used as the soil material。The cement accounts for 15% of the total volume according to the

design XXX stacking area。and the XXX and dump trucks。Due

to the narrow area of the backfilling area。the material is

distributed and leveled using a small excavator。XXX is not less

than 0.94.

5.2.2 XXX Backfilling

XXX used for the n layer in this project is concrete aggregate

crushed stone。with a maximum particle size of no more than

50mm。When mixing the XXX。the amount of XXX for more

than 30% of the total weight。After on-site mixing。the material

is distributed XXX layer by layer using a n roller。with a

compactness of 0.94.

6.n Quality Control

6.1 General Requirements The backfilling quality of this project requires high standards。During n。strict control is exercised over the cleaning of the base。material n。spreading。and n processes。XXX material should

have a clay content of 15% to 30% and a plasticity index of 10 to

n density of the XXX should not be less than the n

density of the backfill soil below the top of the steel pipe should

not be less than the n density of the top of the pipe

should be 0.92.

6.2 Base XXX

6.2.1 Before backfilling。the backfilling base should be XXX

impurities。water。or holes in the base.

6.2.2 The base should be XXX backfilling.

6.2.3 When the XXX meets the original soil surface。before

n。the original slope should be cleaned of weeds。bark。etc。and the slope of the pre-XXX 1:2.

6.3 Soil Thickness XXX is about 35cm。and for XXX。the thickness of soil

spreading should be appropriately ced。with each layer controlled

within 30cm.

6.4 XXX

6.4.1 土工格栅作为加筋土体材料,必须经过专项验收。验收内容包括:外观均匀,网孔大小形状均匀,无损伤、破裂、油污等问题,无缺筋、网格斜歪或网眼抽缩现象。同时,进场的土工格栅必须按照设计指标进行检测。

6.4.2 在回填土分层压实时,必须分层铺筑,上下层接缝错开,层面间刨毛、洒水,分段、分片碾压。相邻作业面的搭接碾压宽度,平行边墙走向方向不小于0.5m;垂直边墙走向方向不小于3m。碾压机械行走方向平行于调节池、进水池、主副厂房边墙走向。建筑物周围0.5m范围内采用人工夯实。建筑物顶板以上1m范围内回填土不采用机械压实。

6.4.3 在进行碾压施工时,相邻施工段的作业面应该均衡上升。分段间有高差的连接时,垂直碾压方向的各种接缝,应以斜面相接,坡度可采用1:3~1:5,高差大时宜用缓坡。填筑时应随填筑面上升进行削坡,并削至质量合格层;削坡合格后,应控制好结合面土料的含水量,边刨毛、边铺上、边压实;接缝碾压时,应跨缝搭接碾压,其搭接宽度不小于3.0m。

6.4.4 在填筑前,必须对填筑土料的含水率进行测量控制。含水率高的土料在堆土区翻晒合格后再运至填筑区,含水率不足的,及时洒水,使含水率控制在规范要求范围以内。

6.4.5 若发现局部“弹簧土”、层间光面、层间中空、松土层或剪切破坏等质量问题时,应及时进行处理,并经检验合格后,方准铺填新土。

6.4.6 在施工过程中,必须保证观测设备的埋设安装和测量工作的正常进行,并保护观测设备和测量标志完好。

6.5 在建筑物墙后进行土方回填时,必须采取分层施工,用推土机分层压实。主副厂房四周保持均衡上升,压实面高差不大于300mm。建筑物周边回填土方,在建筑物强度达到设计强度75%的情况下施工。填土前,必须先清除建筑物表面的乳皮、粉尘及油污等。对表面的外露铁件(如模板对销螺栓等)宜割除,必要时对铁件残余露头需用水泥砂浆覆盖保护。填筑时,须先将建筑物表面湿润,并涂刷用塑性指数IP大于17的粘土制备的泥浆,泥浆的浓度为1:3.0(土水重量比)。边涂泥浆、边铺土、边夯实,涂浆高度应与铺土厚度一致,涂层厚度为3mm,并与下部涂层衔接。严禁泥浆干固后再铺上、夯实。

6.6 在进行管道回填时,必须按照设计要求进行回填。填筑时,必须先将土料压实,然后进行回填,填筑高度不宜超过管道顶部。填筑土料的含水率应控制在规范要求范围以内。在回填过程中,必须注意管道的保护,避免对管道造成损害。

1.对于管道槽底至管顶以上500mm范围内的回填土,采用人工对称分层运入槽内,不使用大型机械进行施工。对于管顶500mm以下的回填土,不使用机械辗压,采用人工夯实。而对于500mm以上的回填土,采用机械辗压,机械行驶方向垂直于管沟。

2.在冬季填方前,必须清除基底上的冰雪和保温材料。填方上层用未冻、不冻胀或透水性好的土料填筑,其厚度应符合设计要求。在冬季回填土方时,每层铺筑厚度比常温施工时减少20%~25%,其中冻土块体积不超过填方总体积的15%;且粒径不大于150mm。铺冻土块均匀分布,逐层压(夯)实。回填土方的工作必须连续进行,防止基土或已填方土层受冻。并且要及时采取防冻措施。

3.在XXX运输时,需要设专人负责施工道路清扫,定时洒水降尘。严格控制现场土方预存量,并控制其含水量,严禁刮风扬尘,必要时可采用洒水降尘。

4.建立健全安全组织机构,坚决贯彻“预防为主,安全第一”的方针。严格执行安全生产制度,公司设立一名专职环境安全检查员,各施工配合队伍出一专人,配合进行环境安全监督工作。认真执行建筑施工安全检查标准,做好分部分项安全检查工作。每个分项工程开工前首先进行安全教育,进行安全技术交底,并派专人负责。严格执行安全教育制度,对新进场员工首先进行三级入场教育,考试成绩合格后方可进行施工。强化特殊工种持证上岗制度。对于特殊工种,要求持证上岗,并进行定期培训,经考试合格后方可进行操作。强化施工现场安全纪律,严惩违章指挥,违章作业和冒险作业,杜绝管理人员违章指挥和强令作业现象。加强运输道路的定期维护,为车辆运行创造良好的环境。对车辆定期严格检查,确保刹车、前后灯等灵敏可靠。夜间施工保证所有部位的照明度不低于30LX。在各个交通路口设红灯示警,设专人指挥。雨季施工有专人排水,洒石屑等物,确保路面平整、坚实、无积水。禁止将车辆靠近边坡2m以内范围。

5.施工机械配置需要根据具体情况进行调整和安排,以保证施工效率和安全性。

本工程采用4辆10吨自卸卡车运输土料,3台挖掘机铺设,1台3吨振动碾压机用于建筑物边缘、大型设备无法到达的边角以及管道和建筑物顶板上1米范围内等部位。此外,还采用2台2.2千瓦电动冲击夯夯实。

施工进度计划如下:

1.左侧回填时间:2014年4月16日至2014年4月23日;

2.右侧回填时间:2014年4月20日至2014年4月28日;

3.副厂房段水泥土回填时间:三孔一联段:2014年4月16日至2014年4月20日;四孔一联段:2014年4月19日至2014年4月25日; 4.副厂房段土方回填时间:2014年4月27日至2014年4月30日。

发布者:admin,转转请注明出处:http://www.yc00.com/xiaochengxu/1689534082a263939.html

相关推荐

发表回复

评论列表(0条)

  • 暂无评论

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信