地上停车场验收流程
英文回答:
On-Site Parking Lot Acceptance Procedure.
1. Pre-Inspection.
Review construction documents, including plans,
specifications, and inspection checklists.
Conduct a site visit to verify the scope of work and
identify any potential issues.
Schedule the final inspection with the contractor,
engineer, and other relevant parties.
2. Inspection.
General Site: Inspect the overall condition of the
site, including drainage, grading, and landscaping.
Pavement: Verify the type, thickness, and quality of
the pavement materials. Check for any cracks, potholes, or
uneven surfaces.
Curbs and Barriers: Ensure that curbs and barriers are
properly installed, aligned, and meet specifications.
Signage and Markings: Verify the visibility and
compliance of all traffic signs, pavement markings, and
other signage.
Lighting: Check the functionality of all lighting
fixtures, including streetlights, security lights, and
pedestrian walkways.
Utilities: Ensure that all utilities, such as storm
drains, electrical conduits, and water lines, are properly
installed and concealed.
Accessibility: Inspect the site for compliance with
applicable accessibility standards, including ramps,