印尼拉布湾项目调试方案清单(中英文)
印尼拉布湾2×300MW机组调试项目调试方案和措施清单
序列号
一
0001
二
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
三
2001
2002
综合
调试大纲
锅炉专业
启动锅炉调试措施
Commissioning Procedure for Startup Boiler
压缩空气系统调试措施
Commissioning Procedure for Air Compressor System
引风机及系统启动调试措施
Commissioning procedure for Induced Draught Fan System
空预器及系统调试措施
Commissioning Procedure for Air Preheater System
送风机及系统启动调试措施
Commissioning procedure for Forced Draft Fan System
一次风机及系统启动调试措施
Commissioning procedure For Primary Air Fan System
锅炉冷态通风试验方案
Test Procedure for Cold State Air Draught
燃油系统调试措施
Commissioning Procedure for Fuel Oil System
锅炉蒸汽吹管措施
Commissioning Procedure for Boiler Steam Blow
锅炉整套启动调试方案
Commissioning Procedure for Boiler Unit Startup
锅炉蒸汽严密性试验和安全门整定方案
Commissioning Procedure for Boiler Steam Tightness and Safety Valve
Setting
锅炉除、输灰渣系统启动调试方案
Commissioning Procedure for Ash & Slag Handling System
锅炉制粉系统启动调试方案
Commissioning Procedure for Coal Pulverizing System
锅炉燃烧调整及低负荷稳燃措施
Commissioning Procedure for Boiler Combustion Adjustment And
Lower Load Steady Combustion
锅炉吹灰系统投运措施
Commissioning Procedure for Soot blowing system
输煤系统调试方案
Commissioning Procedure for Coal Transfer System
汽机专业
闭式冷却水系统调试方案(王广庭)1
Commissioning Procedure for Closed Cooling Water System
循环水系统调试方案(许涛)3
Commissioning Procedure for Circulating Water System
动力所
动力所
方案名称
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
责任部门
第 1 页 共 3 页
印尼拉布湾项目调试方案清单(中英文)
序列号
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
四
3001
方案名称
凝结水系统调试方案(王广庭)2
Commissioning Procedure for Condensate Water System
润滑油、顶轴油系统及盘车调试方案(王广庭)3
Commissioning Procedure for Lube & Jacking Oil System and Turning
Gear
真空泵及其系统试运措施(许涛)1
Commissioning Procedure for Vacuum Pump System
电动给水泵启动调试方案(王广庭)4
Commissioning Procedure for Electrical Driven Feedwater Pump
Startup
汽动给水泵组启动调试方案(张才稳)1
Commissioning Procedure for Steam Driven Feedwater Pump Startup
发电机密封油系统试运措施(张才稳)2
Commissioning Procedure for Generator Sealing Oil System
发电机内冷水系统试运措施(张才稳)3
Commissioning Procedure for Generator Stator Cooling Water System
汽轮机调节保安系统调试方案(蒋辉)
Commissioning Procedure for Turbine Adjust & Security System
汽轮机整套启动调试方案(张才稳)4
Commissioning Procedure for Turbine Unit Startup
汽轮发电机组轴系振动检测方案(王广庭)5
Vibration Monitoring Procedure for Axial Group of Turbo-generator set
汽轮机超速试验措施(蒋辉)
Turbine Over Speed Test Procedure
汽轮机汽门严密性试验方案(张才稳)5
Turbine Steam Valve Tightness Test Procedure
汽轮机真空严密性试验措施(许涛)2
Turbine Vacuum Tightness Test Procedure
汽轮机甩负荷试验方案(蒋辉)(蒋辉3+张才稳5+王广庭5+徐涛3)
Turbine Load Rejection Test Procedure
电气专业
升压站、启备变及厂用电系统受电方案
Energizing Procedure for Switchyard, Startup/Standby Transformer And
Auxiliary Power System
升压站及启备变保护系统调试方案
Commissioning Procedure for Protection System of Switchyard and
Startup/Standby Transformer
发变组保护系统调试方案
Commissioning Procedure for Protection System of G-T Group
励磁系统调试方案
Commissioning Procedure for Excitation System
同期系统调试方案
Commissioning Procedure for Synchronizing System
厂用电切换系统调试方案
Commissioning Procedure for Auxiliary Power Automatic Switchover
System
电气整套启动试验方案
Startup Procedure for Electrical Equipments of No.1 Turbo-generator
第 2 页 共 3 页
责任部门
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
动力所
高压所
3002
3003
3004
3005
3006
3007
继电所
继电所
自动化所
自动化所
自动化所
高压所
印尼拉布湾项目调试方案清单(中英文)
序列号
set
五
4001
4002
4003
4004
4005
4006
4007
4008
六
5001
5002
5003
5004
5005
5006
热控专业
方案名称 责任部门
自动化所
自动化所
自动化所
自动化所
自动化所
自动化所
自动化所
自动化所
化环所
化环所
化环所
化环所
化环所
化环所
顺序控制系统(SCS)调试方案
Commissioning Procedure for SCS
计算机监视系统调试方案(DAS)
Commissioning Procedure for DAS
锅炉炉膛安全监视系统(BNS)调试方案
Commissioning Procedure for BMS
模拟量控制系统(MCS)调试方案
Commissioning Procedure for MCS
旁路控制系统调试方案
Commissioning Procedure for Bypass Control System
汽轮机数字电液控制系统(DEH)调试方案
Commissioning Procedure for DEH
汽轮机监视、保护系统调试方案
Commissioning Procedure for TSI & ETS
模拟量控制系统负荷变动试验方案
Test Procedure for Automatic Unit Load Variation
化学专业
锅炉补给水处理系统调试方案
Commissioning Procedure for Boiler Makeup Water Treatment System
电解海水制次氯酸钠系统调试方案
Commissioning Procedure for Sodium hypochlorite System
锅炉本体化学清洗方案
Commissioning Procedure for Boiler Chemical Cleaning
炉前系统化学清洗方案
Commissioning Procedure for Pre-boiler System chemical cleaning
整套启动化学监督方案
Chemical Supervision Procedure for UNIT Startup and Trial Operation
凝结水精处理系统调试方案
Commissioning Procedure for Condensate Polishing System