金刚砂盲道施工流程
英文回答:
Diamond Grit Tactile Paving Installation Process.
Materials:
Diamond grit tactile paving tiles.
Adhesive.
Substrate (e.g., concrete, asphalt)。
Measuring tape.
Trowel.
Notched trowel.
Float.
Sponge.
Steps:
1. Site Preparation:
Clean and prepare the substrate by removing dirt,
debris, and any existing adhesive.
Ensure the substrate is flat, level, and moisture-
free.
2. Layout and Measurement:
Determine the desired location and orientation of
the tactile paving tiles.
Measure and mark the layout on the substrate using
a measuring tape.
3. Adhesive Application: