英文回答:

Diamond Grit Tactile Paving Installation Process.

Materials:

Diamond grit tactile paving tiles.

Adhesive.

Substrate (e.g., concrete, asphalt)。

Measuring tape.

Trowel.

Notched trowel.

Float.

Sponge.

Steps:

1. Site Preparation:

Clean and prepare the substrate by removing dirt,

debris, and any existing adhesive.

Ensure the substrate is flat, level, and moisture-

free.

2. Layout and Measurement:

Determine the desired location and orientation of

the tactile paving tiles.

Measure and mark the layout on the substrate using

a measuring tape.

3. Adhesive Application: