热流道模具转颜色sop 英文流程

热流道模具转颜色sop 英文流程


2024年4月23日发(作者:)

热流道模具转颜色sop 英文流程

Title: Color Change SOP for Hot Runner Mold

Introduction:

This Standard Operating Procedure (SOP) provides a step-by-step

guide for the color change process in a hot runner ng to this

SOP ensures efficient and accurate color transitions, maintaining the

quality of the final product.

ation:

Before starting the color change process, gather all necessary tools

and materials, including color change kits, mold clamps, and safety

equipment.

准备工作:

在开始颜色转换过程之前,请准备好所有必需的工具和材料,包括颜色转换

套件、模具夹具以及安全装备。

Shutdown:

Secure the mold and shut down the injection molding

all safety protocols are followed to prevent any

accidental injuries.

模具关闭:

固定模具并关闭注塑机。确保遵循所有安全协议以防止意外伤害。

g Down:

Allow the mold to cool down to a safe temperature for

ensures the mold can be safely worked on during the color change.

冷却降温:

让模具冷却至安全操作温度。这样可以确保在颜色转换过程中安全地对模具

进行操作。

Change Kit Assembly:

Assemble the color change kit according to the mold

sure all components are clean and in good working

condition.

颜色转换套件组装:

根据模具需求组装颜色转换套件。确保所有部件清洁且处于良好工作状态。

Disassembly:

Disassemble the mold following the reverse order of the

note of the positioning of each part to facilitate reassembly.

模具拆解:

按照组装相反的顺序拆解模具。记录每个部件的位置,以便于重新组装。

Change Process:

Replace the necessary mold cores and inserts with those

corresponding to the new a proper fit and alignment to

maintain product integrity.

颜色转换过程:

用新颜色的对应模具核心和插入件替换必要的模具部件。确保配合良好且对

齐,以保持产品完整性。

Reassembly:

Reassemble the mold, ensuring all parts are correctly

-check the alignment of the cores and inserts to

prevent any issues during the molding process.

模具重新组装:

重新组装模具,确保所有部件正确就位。再次检查核心和插入件的对齐情况,

以防在注塑过程中出现问题。

Startup:

Restart the injection molding machine and begin the mold startup

r the first few shots to ensure the color change has been

successful.

模具启动:

重新启动注塑机并开始模具启动过程。观察前几次射击,确保颜色转换成功。

y Check:

Perform a thorough quality check on the first molded parts to ensure

they meet the required any necessary adjustments if

defects are found.

质量检查:

对首次成型的部件进行彻底的质量检查,确保它们符合所需的规格。如果发

现缺陷,进行必要的调整。

ntation:

Record all steps taken during the color change process for future

reference and continuous improvement.

文件记录:

记录颜色转换过程中的所有步骤,以供未来参考和持续改进。


发布者:admin,转转请注明出处:http://www.yc00.com/news/1713847794a2330397.html

相关推荐

发表回复

评论列表(0条)

  • 暂无评论

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信