固化地面的施工流程
English Answer:
1. Preparation of the Substrate.
Remove all existing floor coverings, adhesives, and
contaminants from the substrate.
Repair any cracks or damage to the substrate using an
appropriate patching material.
Prime the substrate with a suitable primer to improve
adhesion.
2. Application of the Base Layer.
Pour the base layer material onto the prepared
substrate and spread it evenly using a trowel or screed.
Level the base layer using a level or laser level to
ensure a smooth and level surface.
Allow the base layer to cure for the manufacturer's
recommended time.
3. Application of the Wear Layer.
Apply the wear layer material over the base layer
using a trowel or roller.
Spread the wear layer evenly and compact it using a
finishing trowel or power trowel.
Allow the wear layer to cure for the manufacturer's
recommended time.
4. Grating and Sealing.
Grind the cured wear layer to remove any imperfections
or unevenness.
Apply a sealer to the wear layer to protect it from
moisture, chemicals, and abrasion.
Allow the sealer to cure for the manufacturer's
recommended time.
5. Final Inspection.
Inspect the finished surface for any imperfections or
defects.
Repair any imperfections or defects as necessary.
Chinese Answer:
1. 基质准备。
去除基质上的所有现有地板覆盖物、胶粘剂和污染物。
使用合适的修补材料修复基质上的任何裂纹或损坏。
使用合适的底漆对基材进行底漆处理,以提高附着力。
2. 底层的应用。
将底层材料倒在准备好的基材上,并用抹刀或镘刀将其均匀摊
平。
使用水准仪或激光水平仪对底层进行找平,以确保表面光滑平
整。
让底层固化制造商建议的时间。
3. 耐磨层的应用。
使用抹刀或滚筒将耐磨层材料涂抹在底层上。
均匀涂抹耐磨层,并使用抹光收光器或动力抹光机将其压实。
让耐磨层固化制造商建议的时间。
4. 刮擦和密封。
打磨固化的耐磨层,以去除任何瑕疵或不平整。
在耐磨层上涂抹密封剂,以保护其免受水分、化学物质和磨损。
让密封剂固化制造商建议的时间。
5. 最终检验。
检查成品表面是否有任何瑕疵或缺陷。
根据需要修复任何缺陷或缺陷。